Project Cases

C&D Yuefu Residential (Xiamen, China)

Release time :2024-01-05 09:32:56   Views:
Project Start Date:  From March 10th, 2021
Project Location: Northwest of the intersection of Fangyang West 3rd Road and Fangbei 2nd Road, Lian’an Area, Xiang’an District, Xiamen, Fujian Province, China
Areas Utilizing BIM: Two-Levels Basement
Total Construction Area: 54150m2(sq.ft)

Applications of BIM:

Bimodeling applies Building Information Modeling (BIM) technology to develop 3D digital models that precisely match on-site dimensions. The team conducts comprehensive checks for design errors, omissions, clashes, and missing components. Through integrated modeling, the mechanical, electrical, and plumbing (MEP) systems are optimized and detailed construction drawings are produced. This process helps improve the quality of the design documentation and supports the client in implementing the drawings effectively on site.

1. BIM Model of the C&D Yuefu Residential
Constructing a BIM model is the fundamental basis of all the activities during the design and construction phase of a building.

Architectural and Structural Model
 
MEP System Model

2. Construction Phase
3D visualization used to guide on-site construction
Section Drawing - Basement Level 2
 
3D View - Basement Level 2